From: route@monster.com
Sent: Tuesday, August 23, 2016 12:35 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Submitted by: Sherry Bell ÆGray Wolf Recruiters, LLC Æsherry@graywolfrecruiters.com Æ336-323-8296 DEREK CLARKE 512-783-0553
derekclarke55@aol.com ISP / OSP TELECOM SPECIALIST Engineer w Field Technician w Inspector TECHNICAL SKILLS ·
Assist with
network construction activities for paperwork, inspection and verification
tasks. ·
Monitor
contractor and sub-contractors performing installation, cable placement, and
splicing tasks, project management experience. ·
Prepare
preliminary site surveys for building entrance construction requirements and
rack space, assess security and site access requirements. ·
Perform
OTDR, power meter and acceptance testing on ad-hoc basis. ·
Install and
test fiber optic patch cords as needed. ·
Respond to
emergency needs, providing on-site expertise, guidance and technical
assistance. ·
Provide
quality inspections of underground facilities, including but not limited to
creation of restoration punch-lists. ·
Generate
Statements of Work and issue Request for Quote for OSP Design, Construction
and Splicing, cost estimating and MOPs. ·
Maintained
Level III installations for Central Office, cell sites, CMTS shelters and
hubs. ·
Furnish OSP
fielding, joint pole, pole analysis, make ready, design, walk outs and
locates. ·
Familiar
with all types of Telecom cable; hands-on experience with Flat IPC /
Non-Twisted Telephone Cable and CAT5/CAT5e/CAT6. PROFESSIONAL EXPERIENCE OSP Make Ready
Engineer
01/2016 - 02/2016 Contractor Charlotte,
North Carolina ·
On the job
training for SPICA CALC 5, pole loading analysis software. ·
Fielding
included height of attachments following the power poles for Google Network. ·
Gathered
accurate field notes to input into laptop for pole loading analysis. ·
Red lined
poles for Make Ready work to include, line clearing, tree trim and pole
replacement. OSP QA/QC
Inspector
05/2015 – 07/2015 Contractor
Blue-NOC MasTec Austin,
Texas ·
QA/QC
inspector for aerial placement of Google Fiber network. Verified height of
attachment is compliant to NESC heights to insure poles are “make ready” for
construction, that included: tree trim, line clearing, guy and anchor
placement. ·
Trained new
hires in the use of height stick, and data input for project deliverables ·
Verified
HOA at telephone pole and mid-span locations. Facilities
Engineer
1
08/2014 – 12/2014 General
Communications Inc. Anchorage,
Alaska ·
Planned and
implemented the design of plants, offices, and production lines in order to
maximize the use of available space and improve production efficiency. ·
Estimated
costs related to layout design for equipment and materials, labor, monitored
the construction process. ·
Researched
production/processing equipment or fixtures for purchase and gathers data
relating to their ability to meet organizational needs. ·
Ensured
that established efficiency and safety targets were met. ·
Maintained
knowledge of commonly-used concepts, practices/procedures in particular
field. ·
Followed
network requirements; also responsible for all sites and data centers related
to the Cable Modem Network. ·
Created BOMs
and gather RF queues. ·
Followed
and suggested changes to MOPs for installation (including rack elevation,
connectors (RG-59), rectifiers, power cables, and CMTS components); also
Arris E6000 Router. ·
Provided
OSP/ISP walkouts to gather info. for development of Statement of Work (SOW). Field
Operations
Technician
01/2014 –
08/2014 General
Communications Inc. Anchorage.
Alaska ·
Performed
field installs to support: Cable modem MTO SONET/Ethernet Gb network. ·
General
Packet Radio System Architecture supported SONET/OC-3; Ethernet services. ·
Installed
racks, power wiring – lacing, coax cable and fiber/jumper management. ·
Installation
of network equipment: Juniper Routers, Arris E6000 Routers. ·
Equipment
included: Marconi LH; Cisco 9010, 9001, ASA 5500 and ME 3600. ·
General
Dynamics 184 (1.8 meter) Antenna for Ku-Band and C-Band systems. ·
Comtech
Satellite modems; Smart UPS systems. ·
Performed
RF site surveys. ·
Tested coax
splitter/combiner for uplink/downlink using JDSU DSAM. ·
Lacing
Skills: Kansas and Chicago stitch. Field
Operations Technician
(Contract)
09/2013 –
12/2013 ·
Icon
Communications/TDS Telecom Broadband Project Maine Installed 4-O and #2 AWG
to Breaker Distribution Fuse Bay (BDFB) for DC Power. ·
Installed
racks/fiber trays inside CO’s Nodes, Cell Sites, and Data Centers. ·
Installed
Cyan Z Optical series supporting: SONET/SDH/OTN/DWDM/IPTV/100 Gb. ·
Provisioned
equipment for network (Cyan Z33 headend router). ·
Followed
CO’s MOP for installation of equipment and document installation for PM. ·
Laced all
cables using various stitches. Field
Operations Technician,
(Contract)
06/2009 – 08/2013 Verizon,
Wind-Stream FTTC Project WV and OH ·
Performed
power verification and power up of equipment in the field. ·
Turned up
fiber links to SFP/XFP’s; perform fiber power testing. ·
Performed
installation at cell site shelters and Charles boxes. ·
Installed
CYAN Z Series Accedian NID’s and Telect 20amp fuse panels. ·
Assigned IP
address, subnet and gateways. ·
Configured
equipment (10G, Ethernet and Qos). ·
Tested
RG-59 port end-to-end and RF frequencies. OSP Design
Engineer
(Contract)
05/2009 – 05/2010 ·
Fiber to
Cell Site, Wind-Stream KY and WV. ·
Performed
R/W survey and permit surveys. ·
Performed
field work for easements, and make ready pole assessments. ·
Performed
field work for DOT road crossing for county roads and state highways. ·
Performed
field work for RR crossings permits. OSP Engineer/Fielder for Video Ready Access
Device (Contract)
10/2007 – 5/2009 ·
Fiber to
Cell Site Inspector, AT&T San Gabriel Joint Pole Audits, AT&T
Northern/Southern CA. ·
Performed
work for the design and installation of VRAD equipment. ·
Performed
joint pole field survey and audit work. ·
Performed
make ready audits using GEO 95, NESC pole knowledge. ISP/OSP
Engineer Verizon
(Contract)
01/2006 – 10/2007 OSP Field
Engineer FTTP, FTTH California ·
Performed
field survey work for FTTP, FTTH, MDU and MTU work orders. ·
Performed
pole guying and anchoring. ·
Performed
ROW permitting when applicable Performed field work on FTTH work orders. ·
Performed
site walks collected accurate field notes Underground, aerial and direct
buried (BAU) FTTP design and engineering FTTP OSP Engineer Verizon National
Cable Mining Project. ·
Performed
trunk audit at CO’s to and verified using plant records ICGS. F2 P-Commit on
Premise for AT&T
(Contract)
06/2005 – 12/2005 Light-Speed
Project, AT&T Sacramento,
CA ·
Responsible
for P-commit F2 pair, run reports for various USOC codes. ·
Applied
AT&T applications in performance of work orders. Acela
Technologies, Inc. Fredrick, MD
(Contract)
01/2005 – 12/2005 ·
Project
Manager ISP for Hotel Rehab Project. ·
Project
manager on site providing technical support of cable plant rehab Managed
category 5 and coax cable. ·
ISP project
for hotel upgrade Supervised installation crews and created daily reports. ·
Met with
General Contractor to coordinate cable plant installation work Director of
Operations and Business Development. Washington
Integrated Technology,
Inc.
11/1995 – 12/2004 Silver Spring,
MD. ·
Project
Manager for telecom closet audit of 157 sites. ·
Negotiated
and awarded $2.8 million contract for PBX systems. ·
Scheduled
and coordinated access for sub’s and crews. ·
Managed all
cable installations for voice and data solutions. ·
Managed
installation of 30+ Lucent PBX and voice mail systems. ·
Managed installation
of music on hold solutions at 150+ sites Performed cost estimates, blueprint
take-offs and created BOMs. EDUCATION/TRAINING ·
TelcordiaGR1275
certified Level III Installer, AT&T TP 76300 training completed ·
Verizon
IP72202 training completed ·
Distributed
Antenna Systems (DAS for Dummies) ·
WNCT-1
Certification Convergence Technology ·
BICSI
Telecommunication PM course; RCDD ITS Fundamental Course ·
AT&T
Field View Procedures for Plant Location Records ·
AT&T
ARRIS database design training ·
Video Ready
Access Device Engineering Practices (VRAD’S) AFFILIATIONS ·
BICSI
member; SCTE member |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|